It is ideal where time is at a premium. It can be used indoors and outdoors and on both new and existing concrete. Ceramic tiles can then be laid after only 24 hours, natural stone after 3 days and resilient flooring and wood after 4-7 days.
TOPCEM is also ideal for the provision of screeds incorporating underfloor heating, as was the case at Merchiston, where TOPCEM was screeded at a thickness of 75mm over the Velta Classic C17 pipe system. Using TOPCEM allows the underfloor heating to be commissioned after only 4 days.
Mapei is the world's largest manufacturer of adhesives, sealants and chemical products for building. With over 70 years experience, Mapei is a specialist in the production of quality products for the installation of all types of wall and floor coverings, and has a vast range of admixtures and repair products for concrete and building materials.
Tel: 0121 508 6970